EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
TerryS
-
Listing for Category : inspection
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (539)
Research
- (5)
Workshop
- (9)
Empennage
- (73)
Fuselage
- (222)
-
fwd avionics...
-
fwd access panels
-
Fuel sender wiring
-
Installed OAT probe
-
Un-stuck fwd access...
-
Moving day!!!
-
aileron tube boots
-
Windscreen fairing...
-
windshield fairing...
-
Windscreen fairing
-
windscreen install...
-
Glued in Windscreen
-
canopy handle
-
Canopy skirt
-
finished canopy skirt
-
fuselage vertical...
-
cowling oil door
-
continued canopy skirt
-
canopy skirt
-
More canopy skirt prep
-
prep for canopy skirts
-
sealed baffles
-
oil door
-
More cowl work-...
-
oil door
-
started cowl oil door
-
reshaped l/h cowl inlet
-
cowl/baffle interface.
-
Center cabin...
-
Misc
-
Wretched Cowling pt V
-
Wretched cowl IV
-
Wretched cowl III
-
Wretched cowling II
-
wretched engine cowling
-
Avionics access panels
-
finished fwd...
-
finished riveting...
-
yet more fwd skin...
-
continued riveting...
-
fwd fuselage access...
-
inspection peepholes
-
started riveting fwd...
-
sealed firewall...
-
fabricated the inner...
-
cooling fan &...
-
Trimmed windshield
-
canopy latch &...
-
dimpled fwd skin
-
flap motor and...
-
brake lines in cabin
-
fuel plumbing
-
F-746 fwd engine...
-
Started Cabin Lighting
-
Naca Vents
-
floor rib repair
-
brake line passthroughs
-
brake plumbing
-
supertracks...
-
Cowl hinges &...
-
ADSB Antenna
-
Supertrax
-
parking brake valve
-
rebuilt parking...
-
Engine mount
-
canopy latch &...
-
canopy continued.
-
Canopy continued.
-
empennage lower...
-
canopy continued.
-
canopy continued.
-
canopy continued.
-
canopy continued.
-
canopy fit continued
-
canopy trim continued
-
Roll Bar installed
-
The Big Cut
-
first canopy cut
-
Rudder stops
-
Engine is shipping!
-
slider rail
-
canopy frame continued.
-
canopy frame continued.
-
Canopy frame
-
windshield rollbar
-
naca vents
-
substructure...
-
more fwd deck stuff
-
Fwd upper skin etc.
-
Sub panel and fwd...
-
F-7103C-L&R
-
F-7103C-L&R
-
Fwd Upper deck &...
-
finished tailcone...
-
Fuel boost pump
-
seat belt anchors
-
Fwd Upper tailcone skin
-
Fwd upper tailcone skin
-
Aft upper fuselage skin
-
Fuel boost pump...
-
skins, elt mount etc.
-
tailcone wire runs...
-
Fuse skins &...
-
Flap actuator assy
-
Flap system
-
Started working on...
-
cabin tunnel cover,...
-
Installed stick...
-
Primed fwd floors,...
-
Tunnel cover, Center...
-
Nutplates, etc.
-
Antenna Doubler
-
Aft Seat pans
-
Baggage bulkhead,...
-
Aft bulkhead work
-
rudder cable fairings
-
baggage floor conduit
-
F-787 Stiffener...
-
F-786A Fuselage...
-
Aileron bellcrank...
-
Fuselage decks,...
-
F-695 Gussets
-
Work on the cockpit...
-
seatback crossbar,...
-
riveted aft deck
-
Aft Deck, SL000-14...
-
Edge distance on...
-
Shims & elevator...
-
Aft Deck
-
Flip that canoe Baby!!!
-
Recycled Fuse crate...
-
Fuselage cart
-
more riveting
-
More rivets
-
Pound them rivets,...
-
Pound them rivets!
-
fuselage riveting
-
riveting continued
-
Random fuselage assy
-
Started reassembly
-
static line clips
-
primed longerons
-
Dimpled,...
-
disassembly continued
-
prep work and...
-
prep on F-770R
-
F-782 prep plus a...
-
Started fwd fuselage...
-
fwd fuselage floor...
-
fwd fuselage floor...
-
fwd fuselage match...
-
brake & rudder
-
Baggage compartment...
-
floor stiffeners
-
Match drilled F772...
-
F-969 Finished
-
Shimmed F-902,...
-
New F-719-L &...
-
F-684L&R
-
F-719 clip &...
-
fwd cabin mid &...
-
Fwd cabin longerons
-
Match drilled aft of...
-
drilled longerons
-
F-770 conical bends
-
F-770 Side skins
-
Mated aft cabin to...
-
drilled out F-705...
-
Crotch Strap...
-
Center section oopsie
-
seat backs
-
Center section...
-
Center section...
-
Center section...
-
seat frames
-
modify F-721B
-
longerons finished.
-
ELT Bracket
-
Longerons in process
-
Longerons in process
-
dimpled center...
-
Aileron trim
-
Center section...
-
Center section...
-
Longeron update +...
-
Longerons continued
-
Longerons!
-
center section...
-
Center section...
-
Center section
-
F-623 match drill,...
-
F-623 Baggage Ribs
-
aft tailcone...
-
fist assy of center...
-
longeron saga +...
-
pitch servo mount...
-
continued riveting...
-
aft fuselage final...
-
Aft Fuselage...
-
Prep aft fuse...
-
Aft Fuselage continues
-
match drill aft...
-
WD-409 shims
-
Aft Fuselage
-
Aft fuselage
-
WD-409 tailwheel...
-
longeron prep
-
F-705 bulkhead...
-
Bulkheads continued
-
bulkheads continued
-
Fuselage bulkheads
-
F-705 bulkhead...
-
F705 continued
-
continued F-705
-
F-705 bulkhead...
-
Started F-705 bulkhead
-
finished bulkheads
-
Continued work on...
-
Continued center...
-
Started center section
-
Inventory
-
Fuselage kit arrived...
Firewall
- (21)
Tail Feathers
Wings
- (54)
Controls
- (13)
Avionics
- (32)
Lighting
- (14)
Instrument Panel
- (6)
Landing Gear
- (11)
Engine
- (53)
Propeller
- (7)
Fuel System
- (9)
Interior Finish
- (1)
Paint / Decals
- (1)
Inspection
- (1)
Tools
- (3)
misc.
- (4)
Builder Name:
Terry Shortt
-
Project:
Vans
-
VIEW REPORTS
Total Hours:
3270.7
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Sep 12, 2019 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=TerryS
Home or Last Project Picture
No Entries found
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.